MBA Training Data
Load forecasting: why DER signals break utility models
Sponsors in this episode
No sponsor reads found in this episode's notes.
Host-read ads that the notes don't mention can't be found this way.
Show notes
Utility teams still treat load forecasting as a regression against temperature and industrial schedules. This episode argues that world is gone. Rooftop solar can flip the sign of the weather relationship, a passing cloud can return 40 megawatts in 90 seconds, and a midnight EV rate discount can synchronize 10,000 chargers into a spike that never existed before. Bolting DER signals onto the old model produces a more complicated wrong answer.
You come away knowing where the money leaks, through NERC reliability reports and rate cases where a 2% error becomes a nine-figure conversation, why endogeneity breaks price-sensitive models, what probabilistic forecasting with confidence bands gives operators, and why dbt Labs style version control keeps models auditable without telling you they are wrong.
Key takeaways
List every rate change and demand response program launched in the last 18 months, then check whether your model has a variable that reacts to them.
Stop treating weather as a one-directional driver, since rooftop solar can cut afternoon demand instead of raising it.
Model EV charging as behavior shaped by your own price signals, not as a fixed 6 p.m. plug-in assumption.
Publish a range with confidence bands rather than a single megawatt number, so operators know when to keep a reserve plant warm.
Use pipeline tooling like dbt for auditability and speed of fixes, but cross-check vendor claims and treat model correctness as a human judgment.
Chapters
0:00 Why load forecasting stopped being solved
0:46 Rooftop solar flips the weather relationship
1:35 EV charging timers and rate-driven spikes
2:25 Forecast error in NERC reports and rate cases
3:30 Probabilistic forecasting and confidence bands
4:26 Audit your rate changes Monday morning
Go deeper, free lessons
From smart meters to grid telemetry: the energy data stack
Grid reliability rules: NERC standards and the cost of a blackout violation
Rate cases decoded: how utilities justify prices to their regulator
MLOps: monitoring, retraining & drift
How wholesale power markets set the price of electricity
The article: https://www.mba-training.com/en/blog/load-forecasting-utility-der-signals
MBA Training, mba-training.com
From the show's RSS feed.